ENVIRONMENTAL REMEDIATION
This site is a former wood-preserving
facility that treated railroad ties with a creosote and fuel oil mixture. The
soil and groundwater was highly contaminated with creosote and dissolved
PAH's. In 1983 the U.S. EPA placed the site on the National Priorities
List.
Terra was hired in 1999 to construct a funnel and gate
treatment building and a groundwater remedial system. The remedial system
consisted of field piping connecting the treatment building to injection wells
throughout the property. Terra also installed 32 air sparging wells, 4
aeration wells, 18 monitoring wells, and free-product recovery sumps.
|
© Copyright 2008 TERRA ENGINEERING &
CONSTRUCTION CORPORATION All Rights Reserved
|
|